Paul Davis Remodeling
Call 1-866-233-7872 Request Information
or

Before & After

Before

Bath #1 Before

The homeowners had three main priorities in remodeling their master bath: To create a more open and inviting space; install a new lighting system; and update the vanity, shower and bath.

 

After

Bath #1 After

By eliminating the vanity island and installing a double sink vanity along the wall, we were able to maximize the floor space in the room giving the homeowners the open feeling they desired.  Replacing the existing window with glass block allowed for more natural light to illuminate the room while maintaining privacy. Lastly, the bath tub, sinks and shower were all replaced completing the more contemporary look.